01908 714446 Get Free Quote
Solar panels we installed in Quainton, near Aylesbury

Solar and battery for Aylesbury homes, with a fixed price in writing

MCS and NAPIT certified. We measure your roof and put the price in writing, with nothing added later.

5.0 from 38 Google reviews · MCS certified · NAPIT registered · RECC member

0% VAT on solar and battery until 31 March 2027.

Step 1 of 2

Get a fixed price for your Aylesbury home

Roughly what do you spend on electricity a month? *

Pictured: our install in Quainton, near Aylesbury

Accredited, reviewed and local

★ 5.0 from 38 Google reviews

MCS certified
Certificate NAP/82216/26/1 (solar PV and battery), valid to July 2027
RECC member
Membership no. 00078869, valid to April 2027
NAPIT registered
Certificate NAP/82216/26/2 (domestic and commercial electrical), valid to January 2027
IWA approved installer
IWA approved installer
Deposit protection and insurance-backed guarantee
Which? Trusted Trader
Endorsed by Which? after passing its trader assessment
★★★★★
“Called Depth of Light because I was having trouble with my electricity tripping when solar panels kicked in each morning. Matt came round within a few days and spoke with Solis. Between them the fault was identified and Matt came and fitted a new RCD. Fast, professional, friendly service. Would recommend.”
Lorraine Buckmaster · Google review, October 2025
★★★★★
“Matt did an amazing job replacing our old fuse box! He was super clean, kept us informed every step of the way, and did a really professional job. We’ve used him for various other work since and we’ll definitely keep using his services again.”
Kalpana Vekaria · Google review, March 2025

Recent installs near you

10 kWh battery, Aylesbury10 kWh battery, Aylesbury →Solar on a slate cottage, Little KimbleSolar on a slate cottage, Little Kimble →Solar, battery and EV charger, QuaintonSolar, battery and EV charger, Quainton →

What we find on Aylesbury roofs

The Victorian core

Terraces and older stock around the town centre — slate, steep pitch, limited roof width. Array size is set by the roof, and access for scaffold is often the deciding factor on price.

Post-war expansion

Aylesbury grew substantially through the twentieth century, and those estates are the straightforward end: concrete tile, generous slopes, predictable fixings. Consumer units on the older estates are often the thing worth checking rather than the roof.

Berryfields, Kingsbrook and the newer edges

The large modern developments around Aylesbury have steeper pitches and modern construction. Some plots already carry a developer array, usually sized to satisfy building regulations rather than the household. From March 2027 solar is mandatory on new homes, so what you find depends heavily on when the plot was built.

The parts that change the price

Orientation over postcode

Aylesbury yield is close enough to Milton Keynes to make no practical difference to the estimate. What changes your output is which way the roof faces and what shades it.

Access on older streets

Central Aylesbury terraces can be awkward for scaffold, and that is usually where a price difference comes from.

Grid connection

Installations are notified to the network operator before commissioning. The operator depends on your postcode in this area — we confirm it and deal with the notification either way.

Working in Aylesbury from Milton Keynes

Aylesbury is roughly half an hour from Bletchley and we work across the Vale regularly. If your postcode is beyond Aylesbury, it is still worth asking — we travel for the right job rather than drawing a line on a map.

Solar, battery storage or an EV charger? Free survey, fixed written price.

Get a quote

Solar Panels in Aylesbury — FAQ

Around £6,500 to £8,500 for a 4kWp system on a straightforward roof, at 0% VAT. Older terraced property near the centre can cost more because of scaffold access, which we price at survey.

Yes. Wendover, Haddenham, Stoke Mandeville, Weston Turville, Bierton and the surrounding Vale villages are all within the area we work in.

It depends when the plot was built. Solar becomes mandatory on new English homes from 24 March 2027. Plots completed before that may have none, or a small array sized to pass building regulations rather than to match your electricity use.

How it works

  1. 1. We call you back

    Usually the same working day, to talk through what you want and book a survey.

  2. 2. Roof survey

    About 40 minutes at your home. We measure the roof, check the consumer unit and look at where a battery could go.

  3. 3. A fixed price in writing

    With an MCS performance estimate of what the system should generate. Nothing is added later.

  4. 4. Grid notification

    We notify your network operator, or apply for G99 approval first on larger systems, which can take a few weeks.

  5. 5. Installation

    Most homes take one or two days, with scaffold up for the roof work.

  6. 6. Handover

    We set up the app with you and leave the MCS certificate you need to be paid for exporting.

Want a fixed price for a Aylesbury roof?

A survey takes about 40 minutes and you get a written price with nothing left to add later. We handle the DNO notification and the MCS certificate.

Get a fixed price for your Aylesbury home

By sending this form you agree to our Privacy Policy. We won't share your details with anyone.

No obligation • Fixed pricing • MCS & NAPIT certified • Based in Milton Keynes